siyahkalem.com

Construction of Istinye-Darussafaka Road

E-mail Print PDF
Employer:
METROPOLITAN MUNICIPALITY OF ISTANBUL
 
Project value:
4.904.667 USD

 

Description of the project:
 In the business of construction of Istinye Darüssafaka and Common Intrastructure Completion; rough road excavation having the length of 900m, width of 18m, bottom basis, rainwater-domestic sewage production embankment wall, 4000 m2 of reinforced up to 0-12m, road excavation and filling-up, border-sidewalk production have been completed and asphalt covering has been constructed. Road, rainwater, domestic sewage and the business was completed on 5th June 2001.
In the business of road construction of Istinye, Pinar district Balabandere road: road excavation having the length of 1600m, width of 15m, bottom basis material, embankment walls, domestic sewage-rainwater, border-sidewalk productions were completed and were made ready for asphalt covering.
 
Home Construction of Istinye-Darussafaka Road

For SiyahKalem CV Bank

Click for career opportunities.

You can contact us via;

e-mail to siyahkalem@siyahkalem.com or fill the contact form.

What's New

  • Business Development Plan

Fields Of Activity

  • Infrastructure
  • Superstructure
  • Environmental
  • Energy
  • Hydro & Marine
  • Industrial

Head Office

  • A   Altunizade Mah. Ord.Prof.Fahrettin Kerim Gokay C. N:34 34662 Uskudar ISTANBUL
  • T   +90 216 520 02 60
  • F   +90 216 520 02 65
  • E   siyahkalem@siyahkalem.com