Employer:METROPOLITAN MUNICIPALITY OF ISTANBUL
Project value:
USD 4.157.835.-
Description of the project :
 1- In ITÜ Crossoad-Büyükdere Street connection road construction: Row road excavation 996m length 12m width, sub base materials, sub-construction production, retaining walls, borders, and asphalt covering is completed.
 2- In rainwater and wastewater construction of Bayrampasa 50.Yil Street:1750m reinforced concrete pipe construction between Ø1200-Ø2600 diameter for rainwater and concrete pipe wastewater construction is completed.Top-construction materials of the road and border production is completed and its’asphalt coverage is finished.
 3- Construction business of Connection Road of Istinye C Road Darüssafaka:Excavation of 1000m raw road, sub base, rainwater and wastewater productions, retaining walls and upto 0-22m and length of 600m and 5000m2 excavation and filling of soil road is completed.
 The road, rainwater wastewater, and soil road projects are made by our company and 1.estimation business amount is completed on 08.10.1998.Â



Road Construction